Nepovratna finančna sredstva za izgradnjo male komunalne čistilne naprave – MKČN

|
A small municipal wastewater treatment plant is a device for treating municipal wastewater at a location where connection to the public utility network is not possible. In Slovenia, we know several providers who will ensure that your device is properly installed, and at Eurofins ERICo Slovenia, we will perform the first analyses that will bring you one step closer to reducing the environmental tax. This year, some municipalities have also announced subsidies to partially reimburse the costs of installing a new small municipal wastewater treatment plant, and the ECO FUND can also help you. What are your tasks when the ICRC is installed? The investor or operator of the MKČN must, as part of the first measurements (the first measurements must be carried out by a company authorized by the competent ministry), which we carry out for you in our company, provide measurements at the outlet of the MKČN for those pollution parameters for which limit values are prescribed for this MKČN. |
![]() |
|
– most often COD and BOD 5 for WWTPs located outside the agglomeration boundaries. The first measurements are carried out within a period of 3 months to 9 months after installation and at full load of the WWTP, and you then submit an analysis report to the public service provider. Based on this document, the public service provider enters you into the WWTP database and as a result, your payment of the environmental fee for wastewater discharge is reduced by 90%. If you have additional questions or need a quote, please contact Dr. Zdenko Mazej Grudnik or Rožlet Kaučič. |
|
Zdenka Mazej Grudnik T: +386 3 898 19 58 M: +386 31 360 639 |
Rožle Kaučič T: +386 3 898 19 83 M: +386 65 557 494 |
